- Surface: Mostly Paved, except around Johnson Lake
- Length: 15 miles
- Shade: Nicely Shaded
- Difficulty: Easy

The Walnut Creek Trail looked like the perfect trail to ride today. It is 15 miles in length, that would give us a round trip of 30 miles for the day. A perfect length for us. Little did we know the calamity of events that would occur before we were able to get out onto the trail.
Trials of the Trail

Sometimes reading a map from home doesn’t always give you the complete picture. We knew that the Walnut Creek Greenway started around Lake Johnson on the southwest side of Raleigh. It is part of the Raleigh Capital Greenway system. Not being familiar with this area and just looking online, it was not clear where to find the parking lots for this trail. We found additional information on the Raleigh Parks and Recreation map, but again parking was not that easy to locate.
Using Google maps we found a parking lot. We decided to head to the Lake Dam Road lot. The lot was closed for repair beginning in September 2020 and is expected to reopen 2021. We parked along the side of the road with the other cars. It was then we realized that we had a flat rear tire on our truck. Had we stayed parked along the side of Lake Dam Road, we would have been right by the trailhead for the Walnut Creek Trail. First things first, we had to take care of the tire. Getting a flat tire was a hint of how things would go the rest of the day.
This time I have to say “thank goodness for Google Maps!” We were able to find a tire center close by and limp over there so they could put on the spare. The gentleman was so nice. He just changed out the spare while he took care the flat. He said “you look like you were going for a bike ride today. So go!” While he ordered two new tires and scheduled a visit for us to come back, we were able to ride. Off again to find another parking lot for the Walnut Creek Trail.
This time we found the main parking lot for Lake Johnson off of Avent Ferry Road. That lot was closed too! Come to find out the whole north side around Lake Johnson between Avent Ferry Rd and Lake Dam Road is closed for repair. Now what.
Some nice folks, who obviously were familiar with the area and the trail, suggested that we could park off Athens Drive by the Magnet High School stadium lots. After driving back a good half mile on Jaguar Park Drive, there was a huge parking lot. Yippie! Finally we can get this show on the road!
The Trail
Starting from the parking lot, we worked our way downhill to the lake. The surface was ruddy. It was nice for walking, but not so forgiving for biking. After a short stretch we came out at Avent Ferry Road. Those nice folks also had given us directions how to ride on the local streets over to the trail entrance at Lake Dam Road; ride up Avent Ferry Road, turn right onto Lake Dam Road, then just follow it down hill. There was a good bit of traffic, but it was only a short stretch.
Finally two hours later, we made it back to where we began, the trailhead for Walnut Creek trail. Starting at this point, the trail is paved and winds along the Walnut Creek. It starts out in what seems to be a remote area, then takes you through the campus of NC State along Lake Raleigh. Here the trail widens and is very well maintained. This section of the trail is called the Centennial Trail. There is a nice place to “rest and relax” along Lake Raleigh if you want to soak up the view.

Nice paved trail through NC State Campus 
Centennial Trail Information Sign 
Centennial Trail and NC State Map
Leaving the campus area takes you along a section that runs along US-64. You can’t see the traffic, but you can hear it. There are some inner city storm sewers, underpasses; one underpass with a blind curve didn’t even have any lighting. There was a really neat trestle, where we the riders went under and the train went over the trail. That is different. As our helpful “friends” told us earlier, we also came across a trail that took you to the farmers market in downtown Raleigh. Since we had other commitments for the day, we ended our ride when we reached Sunnybrook Road.

The windy way along the creek 
Spur access to the Farmers Market 
Getting ready to pass under the trestle 
This is different…trail runs under the tracks
When we arrived back at Avent Ferry Road, we road up hill along the local roads back to the park lot, instead of diverting back around the lake.
To Sum It Up
As a result of this adventure, we became more comfortable with the Raleigh Greenway System of Trails. It is a well developed system and has many intersecting trails to add variety to any ride. There were a few picnic tables at various locations along the trail. We also passed a couple of port-a-johns, but I wouldn’t count on them.
It was our goal to bike the Walnut Creek Trail all the way over to the Neuse River Trail. Oh well, we weren’t able to complete the full trail, but we will. It is a reason to visit the area again. Overall, it was an enjoyable ride. Best of all we now know where the parking lots are.
Would we ride this trail again? Yes
Fist Visit: October 2020
